Planning Library · Appendix A

Geographic Assessment.

Groundworks is now planned for McMinnville as the public anchor of the Banks–McMinnville corridor. This assessment separates what has been decided from what still needs local evidence before a lease is signed or a funding case is presented.

A.1 Assessment Criteria

Food System Gap

What specific gap does Groundworks fill in this geography? How severe is the disconnect between agricultural production and community access/participation?

Existing Ecosystem Density

How developed is the local food systems ecosystem? Too little infrastructure means no partners; too much means the niche is filled.

Institutional Teaching Alignment

What community colleges and universities exist for Drew's adjunct teaching career? Depth of the teaching pipeline matters for the portfolio career model.

M.N.R.S. Connection

How does the Rangeland Ecology & Management degree connect to the local landscape and reinforce Groundworks' credibility?

Commercial Feasibility

Rent costs, available commercial space, population base, foot traffic potential.

Farm Supply Proximity

Year-round sourcing viability. Growing season length. Existing aggregation infrastructure.

Grant & Funding Landscape

State and regional funding pools, community foundations, institutional support.

Founder Connection

Drew's personal relationship to the place, existing relationships, and quality-of-life alignment.

A.2

Banks–McMinnville corridor

Primary launch geography
The Opportunity

Working farms, small towns, and regional markets sit close together, but the corridor still lacks one dependable public place where local food, prepared meals, and practical learning meet. Corridor-specific agricultural output, food-access, and customer-catchment figures still need to be sourced before this case is used for fundraising.

Teaching Alignment

Nearby college, extension, school, and workforce-training relationships need to be mapped through direct conversations. No institutional teaching partner is confirmed.

Bottom-Line Assessment

This is the chosen geography because it is the setting for the full Rootstock system. McMinnville is the proposed public anchor; growers and other sites can extend north toward Banks. The site, demand, rent, supply, partner, and funding assumptions remain to be validated locally.

A.3

McMinnville

Proposed public anchor
The Opportunity

McMinnville gives Groundworks a recognizable town center for the café, farm stand, teaching kitchen, and public programs. A specific property has not been selected.

Teaching Alignment

The education program can host growers, cooks, educators, and neighbors. Local institutional partners and the demand for each program format still need to be confirmed.

Bottom-Line Assessment

Search in McMinnville first. Require accessible street presence, loading access, workable food-service zoning, and a lease that can support a mission tenant. Do not sign until rent, buildout, permits, and foot traffic are verified.

A.4

Northern corridor sites

Supply and future-site geography
The Opportunity

The land and growers between McMinnville and Banks form the supply and stewardship side of the system. Three Field Commons may hold multiple sites, while Foothold handles property operations and farm management where contracted.

Teaching Alignment

Programming should move in both directions: corridor growers teach at Groundworks, and field-based classes take residents to working sites when partners and access are confirmed.

Bottom-Line Assessment

These sites are not substitutes for the McMinnville public anchor. They are the production, stewardship, and possible future-node side of the same corridor system.

A.5

Evidence still required

Before lease or fundraising
The Opportunity

The local case needs sourced figures for agricultural production, food access, household demand, visitor traffic, commercial rents, and the size of the practical customer catchment.

Teaching Alignment

The partner map needs named, willing organizations rather than assumed relationships. College, extension, school, workforce, and grower partners remain unconfirmed.

Bottom-Line Assessment

The corridor choice is settled for this concept. The evidence behind the site, market, permitting, and funding plan is not. Those questions are the next work, not reasons to borrow figures from another region.